The second café goes to Rue Oberkampf
Choose Rue Oberkampf: four times the canal site’s morning footfall, lower rent and base-case profitability in month nine. Test the slow case before the lease offer expires on 24 September.
The corner, and why a corner
The first shop taught us one thing about location: a coffee bar lives on the walk to work. It sells 60% of the day before 10:30, and it needs to be seen from both directions by people who are already moving. The Oberkampf unit is a true corner, forty metres from the Parmentier metro exit, on the side of the street the morning flow uses. The canal site is prettier and we would sell more cake there in the afternoon, but the afternoon is not what pays the rent.


Three candidates against the first shop
All three sit within twenty minutes’ walk of the Faubourg Saint-Denis shop, close enough to share a roaster delivery and a manager, far enough not to share customers. Oberkampf is the only one on a morning commuter route; the other two are destinations.
Ilo, first shop
Rue du Faubourg Saint-Denis, Paris 10e
- open since 2023
Rue Oberkampf
Rue Oberkampf, Paris 11e, corner site
- candidate
- recommended
68 m² corner unit, 12 terrace seats, 40 m from Parmentier metro.
Quai de Valmy
Quai de Valmy, Paris 10e
- candidate
54 m² canal-side unit, strong afternoons, no morning trade.
Rue de Charonne
Rue de Charonne, Paris 11e
- candidate
82 m² with a wide terrace; rent and works push break-even past two years.
Oberkampf peaks when we are open. The canal peaks after we close.
We counted people passing each doorway for three weekdays in August, the quietest month, so every number here is a floor. The two curves are mirror images. Oberkampf carries 3,800 people an hour past the door at 08:00 and settles to a steady lunch; the canal is empty at breakfast and fills from five in the evening, when a coffee bar with no licence is closing. To make the canal site work we would have to become a wine bar, which is a different business.
1,400
View source data
Results14
| hour | Rue Oberkampf | Quai de Valmy |
|---|---|---|
| 07:00 | 1450 | 380 |
| 08:00 | 3800 | 940 |
| 09:00 | 3100 | 1420 |
| 10:00 | 1900 | 1610 |
| 11:00 | 1600 | 1780 |
| 12:00 | 2400 | 2350 |
| 13:00 | 2600 | 2600 |
| 14:00 | 1700 | 2100 |
| 15:00 | 1500 | 2300 |
| 16:00 | 1650 | 2650 |
| 17:00 | 2100 | 3100 |
| 18:00 | 2300 | 3900 |
| 19:00 | 1900 | 4200 |
| 20:00 | 1400 | 3800 |
Side by side
Charonne is the site everyone liked on the visit and the one the model likes least: the terrace is superb, and the rent plus the works it needs push break-even past two years. The canal site is cheaper to fit out and dead until eleven. Oberkampf wins on the two numbers that matter, morning footfall and rent, and on the one clause that matters, the break.
Results3
| Site | Space | Rent / month | Footfall 08:00 | Lease | Verdict |
|---|---|---|---|---|---|
| Rue Oberkampf, 11th | 68 m², 12 terrace seats | €5,900 | 3,800 | 9-year lease, 3-year break | healthy |
| Quai de Valmy, 10th | 54 m², no terrace | €6,400 | 940 | 6-year lease, no break | degraded |
| Rue de Charonne, 11th | 82 m², 20 terrace seats | €8,200 | 1,900 | 9-year lease, works needed | down |
Three ways the first year goes
The model runs the same site through three ramps, and the interactive version below lets you push any of them further. The number to hold onto is the slow case: if Oberkampf opens well below the first shop’s pace, it still turns in its second year, and the losses before it does are the risk the year-three break exists to cap.
Slow ramp
200 cups a day at month six. Break-even in month 16, with €87k of losses to carry until then. No terrace revenue counted.
Base case
260 cups a day at month six, the first shop’s pace. Break-even in month nine, €36k to carry before it turns, and €99k of profit in year two.
Strong
320 cups a day with the terrace trading. Break-even in month three and €60k of profit in year one; the year-two question becomes a third site, not survival.
Why the date decides more than the site
The landlord has a second offer from a chain and is holding our terms, including the three-year break, until 24 September. After that the break goes and the rent-free period shrinks from three months to one. Opening on 2 March depends on works starting in November, which depends on signing this month. Every week of delay costs the March opening its spring, which is the season that made the first shop.
Where the opening stands
Financing is the long pole and it is nearly done: the bank approved €90k of the €130k loan on the first shop’s accounts and wants the signed lease for the rest. Fit-out quotes are in from two of the three builders we trust. Hiring starts once the date is fixed; the first shop’s head barista has already said yes to running the counter.
What the room will be
Same bones as the first shop: a long counter on the window side so the queue is visible from the street, twenty seats inside, twelve on the corner terrace, and a bench along the back wall for laptops after ten. The fit-out budget is €62k, with the espresso machine and grinders bought outright rather than leased, because the lease terms on the first shop’s machine cost more over four years than the machine did.

The moment the canal lost
The canal site led on every visit. It lost in one exchange, when the footfall counts came back and the shape of the day became visible.
The canal site counts look fine in total, 27,000 a day against 29,000 for Oberkampf. Why does the model hate it?
Because of when they walk past. The canal has 940 people an hour at 08:00 and 4,200 at 19:00. We close at 18:00. Restrict both curves to 07:30 to 18:00 and Oberkampf has 24,000 people in our hours against 15,000 for the canal, with its best hour at 08:00 when the margin is highest.
So the canal is a bar site. Fine. Oberkampf it is, if the break clause holds.
Sign Oberkampf on 24 September, open on 2 March
The recommendation is to accept the landlord’s terms as held, pay the deposit on signature, and start works in the first week of November. The break at year three is the insurance: if the slow case turns out slower, the exit is written into the lease. Sami and I both sign; the bank releases the final €40k the same week.
- Sign the lease and pay the €17,700 deposit on 24 September.
- Confirm the builder from the two quotes in hand by 3 October; works start 3 November.
- Order the machine and grinders in October for a January delivery.
Next steps
- Send the signed lease and the builder’s contract to the bank the week of 28 September.
- Post the three barista roles in October, with the head barista from the first shop running interviews.
- Re-run the footfall count in a cold week of November to check the August floor holds.
- Bring the month-three numbers back to this page in June and compare them with the base case.
Sources
footfall counts, three weekdays per site, 13 to 27 August 2026docs.example.com
cited in Oberkampf peaks when we are open. The canal peaks after we close.Side by sideRun the two-year modelThe moment the canal lost
second-shop financial model, v7docs.example.com
cited in Run the two-year modelWhere the opening standsSign Oberkampf on 24 September, open on 2 March
lease offers and landlord terms, all three sitesdocs.example.com
cited in Three candidates against the first shopSide by sideRun the two-year modelWhy the date decides more than the siteSign Oberkampf on 24 September, open on 2 March